PO Box 4615, Austin, TX, 78765-4615
Phone: 512-394-1011, Fax: 512-394-1016
BECC-NADB-SECO Projects
General Information
Delta Lake I.D.
Harlingen I.D. Cameron County No. 1
Hidalgo County I.D. No. 6
La Feria I.D. No. 3
Hudspeth County Underground Water Conservation District No. 1
AMR-RTU
Proposals
Other Resources
Contact Info
Job Openings
DWR PDF 2.8M
Non DWR PDF 22.5M
Daily Logbook
(ZIP, 58MB)
Requests for Bids/Requests for Proposals
On-Farm Transit Time Flow Meter
(PDF, 117KB)
PVC Pressurized Irrigation Pipe 36"
(PDF, 219KB)
PVC Pressurized Irrigation Pipe 18", 21", 24"
(PDF, 214KB)
Magnetic Insertion Flow Meter
(PDF, 260KB)
EPDM Membrane Liner
(PDF, 185KB)
PVC Low Head Irrigation Pipe 24"
(PDF, 379KB)
PVC Low Head Irrigation Pipe 42"
(PDF, 191KB)
PVC Pressurized Irrigation Pipe 24" PIP 80
(PDF, 179KB)
ADDENDUM 1 - Low Pressure Irrigation Pipe Fittings
(PDF, 29KB)
ADDENDUM 1 - Low Pressure Irrigation Pipe Gates Valves
(PDF, 29KB)
Low Pressure Irrigation Pipe Fittings
(PDF, 194KB)
Low Pressure Irrigation Pipe Gates Valves
(PDF, 182KB)
ADDENDUM 1 - Open Channel Acoustic 2D Velocity Measurement Sensors for a Telemetry and Flow Measurement Sites Project
(PDF, 72KB)
Telemetry System - Submersible Pressure Transmitters
(PDF, 126KB)
Open Channel Water Level and Flow Measurement Sensors
Spread Spectrum Telemetry Radios
State Energy Conservation Office (SECO)
Final Project Report for HIDCC1 Water Conservation Improvements Project - May 15, 2003
(PDF, 2,693kb)
HIDCC1 TWDB Contract 2002-484001 - Project Plan
(PDF, 1,679kb)
Project Plan - Appendix A
(PDF, 184kb)
Project Plan - Appendix B
(PDF, 2,052kb)
Project Plan - Appendix C
(PDF, 1,596kb)
Project Plan - Appendix D
(PDF, 1,807kb)
Project Plan - Appendix E
(PDF, 1,760kb)
Environmental Summary Report for the HIDCC1 Water Conservation Improvements Project
(PDF, 2,742kb)
Final Project Report for the Harlingen IDCC No. 1 Water Conservation Improvements Project
(PDF, 1,604KB)
Project Report - Appendix 1
(PDF, 881KB)
Project Report - Appendix 2
(PDF, 547KB)
Project Report - Appendix 3
(PDF, 432KB)
Exhibit A
(PDF, 299KB)
Exhibit B
(PDF, 104KB)
Exhibit C1
(PDF, 93KB)
Exhibit C2
(PDF, 104KB)
Exhibit D1
(PDF, 68KB)
Exhibit D2
(PDF, 81KB)
Exhibit D3
(PDF, 137KB)
Project Report - Appendix 4
(PDF, 2,007KB)
Project Report - Appendix 5
(PDF, 363KB)
Project Report - Appendix 6
(PDF, 2,742kb)
Bureau of Reclamation - Comments on Draft Project Report - March 2003
North American Development Bank (NADB)
Border Environmental Cooperative Commission (BECC)
Baseline Conditions Report and Irrigation District Indicators for HIDCC1
(PDF, 823kb)
Step I Pre-Proposal for Purchase and Installation of a District Wide Flow Measurement, Telemetry, and Water Delivery Management System
(PDF, 325kb)
_